NEN 1010 is the standard for low-voltage installations. At handover it requires a final inspection consisting of a visual inspection and a series of measurements. Below is a practical checklist to make sure you forget nothing.
Visual inspection
- Have the right protective devices been applied and correctly selected?
- Is the installation soundly built and in line with manufacturer instructions?
- Are connection points, cables and distribution boards correctly marked?
- Is documentation such as schematics and distribution board schedules present?
Measurements
- Continuity of protective conductors.
- Insulation resistance of the installation.
- Operation of the residual-current protection.
- Voltage drop and short-circuit current where applicable.
A measurement without a record is a measurement you get to redo later.
- Daan Vermeer, Product
Recording and handing over
Collect the results in one report and link it to the object. That way the final inspection sits with the installation - findable for you, the client and any inspector.
In Installatiedossier you fill in the NEN 1010 final inspection digitally and the report automatically becomes part of the consumer file. No more loose PDFs that get lost.
Get your dossier in order today.
Try Installatiedossier free for 14 days - no credit card required.